| GCIV1007-1

 | Bridges (including 2jtt)[BR] - Drafting and building of bridges [BR] - Project work on bridges - Bridge Design and Execution - Bridge Project

| |
| 
| |
| Duration : | Bridge Design and Execution : 40h Th Bridge Project : 50h Pr
| |
|  | | |
| Credits/ECTS : |
| |
|  | | |
| Holder(s) : | Bridge Design and Execution : Jean‑Marie Cremer
Bridge Project : Jean‑Claude Dotreppe, René Maquoi
| |
|  | | |
|  | | |
| Course contents :
| GCIV0055-1 : Conception et exécution des ponts
The concepeptual design of bridges has substantially changed during the last decades. That is due to the world techniological and economical development. The curse is aimed at historical, aesthetical and technical considerations on which the bridge design is based. Also the emphasis is put on the creativity and the necessity of a good integration of the structure in its environment. The evolution of the techniques of construction is widely discussed and special attention is paid to those used presently. Worked examples and technical visits support those general considerations.
GCIV0085-1 : Projet de pont
Design a bridge structure appropriate to given conditions and preliminary design of the main structural components. | |
|  | | |
| Contacts :
| GCIV0085-1 : Projet de pont